Beverly Planning Board Adopts Plan Beverly Master Plan 7-0

BEVERLY — December 15, 2020 — Beverly Planning Board unanimously adopts citywide master plan after 18-month process. The board voted 7-0 on December 15 to ratify the Plan Beverly Master Plan, a long-range policy document covering land use, housing, economic development, mobility, and sustainability for the next 10 to 15 years. Planning Director Darlene Nguyen and consultant Tim Love of UTL fielded questions from board member Derek Beckwith on commercial growth strategy, with Mayor Mike Cahill clarifying the plan deliberately steers new development toward redevelopment of underutilized areas along Route 128 and in the Cherry Hill Industrial Park rather than greenfield sites. Two technical amendments were incorporated before the vote: a clarifying caption on a conceptual bicycle network map and the removal of R10-zoned parcels near Enon Street in North Beverly from a study-area map, following a neighborhood meeting that drew praise from Ward 5 Councilor Feldman and resident Chris Pittman of 10 Lakeview Street. The board is scheduled to present the plan to the City Council on December 21 for a non-binding endorsement vote.

Keep reading with a 14-day free trial

Subscribe to The Beverly MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Beverly MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Essex County News · The Boxford Post · The Danvers Post · The Essex Post · The Georgetown Post · The Gloucester Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.